Monday, December 15, 2014

PJ Construction

we are specilized in shoring,Soil Nailing, Guniting,shotcreting,Anchoring, Pile work, Earthwork and de-watering,etc

Pile Anchoring/Screw Anchoring

Anchoring occurs when individuals use an initial piece of information to make subsequent judgments. Once an anchor is set, other judgments are made by adjusting away from that anchor, and there is a bias toward interpreting other information around the anchor.



Soil Nailing work

Soil nailing is a construction technique that can be used as a remedial measure to treat unstable natural soil slopes or as a construction technique that allows the safe over-steepening of new or existing soil slopes. Soil nail components may also be used to stabilize retaining walls or existing fill slopes

Swimming pool Guniting work

A swimming pool, swimming bath, wading pool, paddling pool, or simply a pool, is a man-made container filled with water intended for swimming or other water-based recreation. A pool can be built either above or in-ground, and be constructed from materials such as concrete (also known as gunite), metal, plastic or fiberglass. Pools can be decorative or custom shape and size,

QR Code


Earthwork Excavation

Earthworks are engineering works created through the moving or processing of parts of the earth's surface involving quantities of soil or unformed rock. The earth may be moved to another location and formed into a desired shape for a purpose. Much of earthworks involves machine excavation and fill or backfill.


Pile work

Foundations relying on driven piles often have groups of piles connected by a pile cap (a large concrete block into which the heads of the piles are embedded) to distribute loads which are larger than one pile can bear. Pile caps and isolated piles are typically connected with grade beams to tie the foundation elements together; lighter structural elements bear on the grade beams, while heavier elements bear directly on the pile cap


Dewatering system

Dewatering system by driving bore pipes of suitable dia to required depth at suitable intervals all over / around the entire site , interconnecting all the bore pipes with bigger dia pvc pipes at top and connecting to the motor pump(2.0 Hp) of required numbers to discharge the water away from site including shifting when required with all men material, mobilization and demobilization etc complete duration till the instruction of the site in charge /PMC / Client.


Site Photos

Chennai - completed soil nailing & Guniting work photo