Monday, December 15, 2014

Dewatering system

Dewatering system by driving bore pipes of suitable dia to required depth at suitable intervals all over / around the entire site , interconnecting all the bore pipes with bigger dia pvc pipes at top and connecting to the motor pump(2.0 Hp) of required numbers to discharge the water away from site including shifting when required with all men material, mobilization and demobilization etc complete duration till the instruction of the site in charge /PMC / Client.


No comments:

Post a Comment